Skip to content

Terminal 2 Parking Structure Improvements, HNL

Progress

DesignMay 1 2024
ProcurementTBD
Pre-ConstructionTBD
ConstructionTBD
Post-ConstructionTBD

Project Scope

Improvements to the Terminal 2 parking structure, including but not limited to the following: full rehabilitation of the concrete vehicular riding surface on the top level of the parking structure; concrete spall repairs throughout the parking structure; improvements to the damaged and deteriorated drainage and sewer system infrastructure that supports the parking structure; overhaul of the damaged electrical systems; and possible hazardous material abatement.

Progress Updates

Project Definition Report has been finalized and is under review.

Schematic design to start after ACH concurrence.

You are now departing.

Continue