Terminal 2 Ticket Lobby Improvements, HNL
Progress
PlanningApr 1 2023
DesignTBD
ProcurementTBD
Pre-ConstructionTBD
ConstructionTBD
Project Acceptance / PunchlistTBD
Post-ConstructionTBD
Project Scope
The project will include modifications to the Terminal 2 circulation mall and frontage, including the walkway bridges, roof structures, stairway and elevator cores, USDA stations, ticket lobbies, and Group Tour area; all TSA checkpoints; Domestic Baggage Claims 16 to 31; Additionally, new escalators will be provided to access the pedestrian bridge structures connecting to the Terminal 2 Parking Structure.
Progress Updates
PDR work is on-going.